carl105
carl105 carl105
  • 04-04-2016
  • Mathematics
contestada

what is In 7 days, a group of workers can plant 21 acres. What is their rate in acres per day?

Respuesta :

kelpel197
kelpel197 kelpel197
  • 04-04-2016
So do 21/7 to give you how much they do in a day. The answer is three so they do 3 aceres in a day.
Answer Link

Otras preguntas

What rights do slaves have?
Which of the following would not cause habitat change? a. Building a dam on a river b. A hurricane c. Introducing new hiking trails d. None of the above Please
An Olympic diver is competing for a medal. His height in feet above the water can be modeled by the function f(x)= -2(x-5)(x+1), where x is the time in seconds
When would a baseball hit by a bat have the most potential energy
A fifth grade class collected data about the number of chapters that students read in one week. Their teacher asked them to read a chapter every school day. How
expression that is equivalent to 27e+24
Identify the sentence containing the correct usage of commas. A) Tom, Joe, and Dan went to the movie, played miniature golf, and listened to music. B) Mary and
Why does Elie not describe in detail much of what happened in camp after the death of his father?
the legnth of a rectangle is three times its width. if the length of the perimeter is 64 in, find the length and width
the legnth of a rectangle is three times its width. if the perimeter of the rectangle is 64 in, find the length and width