jesseisom
jesseisom jesseisom
  • 01-03-2019
  • Mathematics
contestada

How much extra concrete was ordered ?

How much extra concrete was ordered class=

Respuesta :

rhondac79c79 rhondac79c79
  • 01-03-2019

Answer:

Patio size: 3 cubic yards

1 cubic yard = $140

5.) 140 x 3 = $420

Step-by-step explanation:

Answer Link

Otras preguntas

A block of weight 1200N is on an incline plane of 30° with the horizontal, a force P is applied to the body parallel to the plane, if the coefficient of the sta
Describe the three values in a learner-centred curriculum that a teacher can useto create a pedagogy of care in the classroom.​
Harold is working on a science project that includes a spreadsheet containing calculated results based on the data. An obviously incorrect result is being calcu
What is my answer the missing numbers
14. Find mMK please :)
if somebody please help me find out what does this picture mean.I know it stands for the Monroe Doctrine but what I want to know is what does this picture mean
A farmer wants to build a pond for her cows. What step must she take in order to build the pond? A. Dig into the zone of aeration. B. Place a permeable material
What is the answer to this problem?
Sherwin-Williams employs outside sales representatives who work with customers such as paint contractors and facility managers to procure the Sherwin-Williams p
find perimeter I’ll mark brainest