​Finishing the construction of a home two days after the contract called for completion (no injury occurs) most likely will be considered

Respuesta :

andriansp andriansp
  • 08-06-2016
Finishing the construction for a longer period than the date that already agreed upon would be most likely considered : Breach of Contracts.
Which mean that the constructor basically fail to met his end of the contract agreement, causing the other party has the right to walk out from their contract
Answer Link

Otras preguntas

How did Asian and African nationalists modify these Western-inspired ideas with local cultural and political traditions to create unique movements of their own?
Are the answers I wrote in the image correct?
2024 challenge math answer sheet
If you select a marble without looking, how likely is it that you will pick a black one?
What factors help predict why the populations of some countries grow faster than others?
In the article the besst of Loch Ness which is tje following wtaments best expresses a central idea of the article
Using front-end estimation, what is the correct estimation of the sum, 23+33+44+51+31 -A. 180B. 170C. 160D. 150
Shelby has 3 five-dollar bills and 2 nickels. How much money does she have?
Give me an analysis on each movie and opinion on whether or not you would recommend and why or why not for each movie,”The outsiders(1983) and The little mermai
How do you write this equation as an addition equation. -8 - 4 is what?