Sadeghshakeri97 Sadeghshakeri97
  • 02-12-2019
  • Mathematics
contestada

60% of the work is done in 17 minutes, 40% of the same work, when is done (in minutes)?

Respuesta :

bridgecostello bridgecostello
  • 02-12-2019

Answer:

It would be 11.333 minutes

Step-by-step explanation:

I solved this by setting up a cross multiplication.

60%/17 so then 40/x.

Then here cross multiplying. 60x=680. divide by 60 and x would = 11.33

Answer Link

Otras preguntas

Which statement describes Lewis Howard Latimer's contribution to technology? He created a more efficient steam engine. He helped improve the production of light
What is the volume of the figure? A. 75 cubic units B. 125 cubic units C. 375 cubic units D. 750 cubic units
Let s = 8. What is the value of 6 + 2s? A. 16 B. 22 C. 28 D. 64
The Organization of Petroleum Exporting Countries (OPEC) controls much of the world's production of oil. If its members decide to lower their daily oil producti
Recently, researchers uncovered the molecular structure of a key protein that retroviruses use to multiply. This was a significant step toward _____.
what is nine tenths plus four 15ths equal
Which statement correctly compares the body’s energy storage molecules?.
Express 0.64 as a fraction in lowest term? A. 64/10 B.5/32 C.4/5 D.16/25
Janice correctly answered 21 of the 24 questions. what percent of the questions did she answer correctly?
what service did the byzantine empire perform for european civilization?