60% of the work is done in 17 minutes, 40% of the same work, when is done (in minutes)?

Respuesta :

bridgecostello bridgecostello
  • 02-12-2019

Answer:

It would be 11.333 minutes

Step-by-step explanation:

I solved this by setting up a cross multiplication.

60%/17 so then 40/x.

Then here cross multiplying. 60x=680. divide by 60 and x would = 11.33

Answer Link

Otras preguntas

What is kinetic energy?
What is the combined area of the two bases of the following cylinder? 200.96 in.2 401.92 in.2 100.48 in.2 50.24 in.2
match the eating disorder to the description of that disorder ​
why should the teacher praise socially cooperations interactions?​
please help asap my work is already overdo!!! the words are unscrambled already ​
Why were many of the canals were built north of rhe ohio river and in the northeast
This is Ratio math look at the picture. ​
express the equation in rectangular form a) r = 2sin(2Θ) b) r = 4cos(3Θ)
how is non-price competition different from price competition?
Find x of this shape.