kimbrachantel2962 kimbrachantel2962
  • 03-03-2020
  • Computers and Technology
contestada

The transition from ____ is initiated by the Job Scheduler according to some predefined policy. At this point, the availability of enough main memory and any requested devices is checked.

Respuesta :

isaacoranseola
isaacoranseola isaacoranseola
  • 04-03-2020

Answer: Hold to ready

Explanation:

This is when the process is waiting to be assigned to a processor. And this is carried out by the short term scheduler, so it can run. This state is immediately after the new state for the process.

Answer Link

Otras preguntas

1. Determining Richter Magnitude - Busan, South Korea. Using the simulated seismogram in the placemark from the Busan, South Korea seismograph station, determin
The map above shows the United States’ land acquisitions between 1803 and 1853. Which territory was gained in 1848 through a purchase arranged by the Treaty of
What is the value of x in the equation below? One-third (12 x minus 24) = 16 2 6 8 10
now i know you multiply the variables with the equation but i dont exactly know if im doing this right.​
Why would Muslims need to protest that they believe in women's rights and are against domestic violence?
A discussion of ethos includes which of the following? I. credibility II. reliability III. authority A. I only B. II only C. I and II D. ll and III E. I, II, a
Whats the use of experimental design in science
Airline ticket : $ 250 salestax:7.5%
'Bukola paid and left' is a complex sentence. Select one:TrueFalse​
what is -3 to the 1/3 power