syeir12345uw syeir12345uw
  • 03-06-2020
  • Biology
contestada

You push a boulder 6 meters across the yard with a force of 500 N. How
much work have you done?

Respuesta :

Princekidus Princekidus
  • 03-06-2020

Answer:

3,000 J

Explanation:

Answer Link
pog1111 pog1111
  • 17-11-2021

Answer:

You've done 3,000 J

Answer Link

Otras preguntas

What is the shortest day of 2021? And What is the Longest Day 2021?
What is true about the structure or function of the plasma membrane? A:It is made entirely of integral proteins. B:Hydrophilic molecules attract the water the c
how does an airplane’s kinetic energy and potential energy change as it takes off and lands? How does this energy change relate to the law of conservation of en
What is the cost of operating a 100 W light bulb for "4 hrs per day" for 30 days, if the cost of electricity is 6 cents kW•h
find the cubed roots of 8(cos216 + i sin216)
9x3^15 can be written as 3^n. What is the value of n​
The movement of tectonic plates in two locations is described below: Location A: Tectonic plates sliding in opposite directions past each other Location B: Tect
Quadrilateral ABCD is a rhombus. AD = 13 cm & BD = 24 cm, find AC
What is the point-slope form of a line with a slope -3 that contains the point (10,-1)
I hate these plz help again