how do you find the mean completion time of a PERT network diagram?​

Respuesta :

okekesarah01642112
okekesarah01642112 okekesarah01642112
  • 02-01-2021

Answer:

PERT is an estimating technique that uses a weighted average of three numbers (see below) to come up with a final estimate. The resulting PERT estimate is calculated as (O + 4M + P)/6. This is called a "weighted average" since the most likely estimate is weighted four times as much as the other two values.

Answer Link

Otras preguntas

Solve each equation write each equation in simplest form 7x/8=21
if two cites are 3 inches apart on a map how far would they be in real life ?
Which analogy most accurately defines scientific theory?
The most important german philosopher of the romantic era was:
What are the benefits to a law firm of outsourcing legal services to a foreign country? what are the potential costs and risks?
6(-2-3x)+8=68 Find x
What type of intelligence allows us to perceive, understand, and imagine emotions?
Why did European exploration continue even after the accomplishment of Vasco da Gama?
If the radious of a ceratain circle is tripled with 8.2 cm then added, the result is the circumgrence fo the circle. find the radius of the circle
What larger social pattern helps explain the clashes between whites and indians on the ohio frontier and, more specifically, their resort to both religious rene