medm0om5iebernan medm0om5iebernan
  • 01-11-2016
  • Mathematics
contestada

A construction company delivered 40 loads of concrete in 5 days.

What was their rate of work?



A.




B.




C.




D.


Respuesta :

melhunt99
melhunt99 melhunt99
  • 05-11-2016
Well 40 divided by 5 is 8 and you don't have options so I would say 8 loads a day :)
Answer Link

Otras preguntas

Solve the following quadratic equation by the square root property of equality. y2 = 36
List three incidents in which the united states refrained from using nuclear weapons
A florist has 66 carnations and 42 roses. What is the greatest number of identical bouquets that can be made without any flowers leftover? A. 4 B. 5 C. 6 D. 7 I
You have a pot with 100 balls. 20 of them are red, 50 are blue and 30 are green. you decide to draw 5 balls from the pot without replacement (i.e. you don't put
The width of a mirror in Shannon’s bathroom is 4/9 it’s length. The area of the mirror is 576 square inches. What are the dimensions?
what did Hitler call his program to deal with the Jewish problem in Europe
Mel is 3 years older than rahfat and aurelio is twice as old as mel. the sum of their age is 57. how old is mel?
How many atoms are found in 600.g of iron
Given that ABCD is an isosceles trapezoid, find x and y.
¿Cuál es el significado del verbo en la siguiente frase? Quise comprar una nueva casa. a) I wanted to b) I tried to c) I wished