leila839 leila839
  • 03-02-2021
  • Mathematics
contestada

Q11.
It takes 3 painters 2 days to complete a job. Work out how long 1 painter would take.

Respuesta :

26liujiaying
26liujiaying 26liujiaying
  • 03-02-2021

Answer:

6

Step-by-step explanation:

1 painter is 1/3 of 3 painters, so the answer is 2 x 3=6

Hope I helped!

Answer Link

Otras preguntas

( ) A line passes through the point (2, 3) and has a slope of 4. An equation of the line is = 4. x - 2 What is the equation of the line in slope-intercept form?
There are 5 bottles in front of you, each with a label.Bottle A: "Neutral"Bottle B: "[H3O+] = 1 x 10-10 mol/L"Bottle C: "pOH = 5Bottle D: "pH = 3"Bottle E: "[OH
Factor out the GCF in the polynomial.32x - 24 =
Suppose that the dollar value v () of a certain house that is t years old is given by the following exponential function.v (t) = 637,000 (1.02)^tFind the initia
find the value of n so that the expression is a perfect square trinomial and then factor the trinomial. x^2+10x+n
identify the beginning of a sample period for the function
Whats the main difference between true and false. And how can you tell if a problem is true or false?11.construction of a frequency polygon, the class limits ar
i need help with steps on how to solve this :)
Pretty please help!!!If x= -3, which number line shows the value of |x|?
The functions f(x) and g(x) are shown on the graph.f(x) = |x|What is g(x)?A. g(x)=Ix-5lB. g(x) = Ixl-5C. g(x) = lxl+ 5D. g(x)= |x+5|