Jin schedules 496 hours for a project. He plans to work 8 hours each day. How many days will it take to complete the project?​

Respuesta :

penguinlife90 penguinlife90
  • 01-12-2021

Answer:

62 days

Step-by-step explanation:

496/8 = 62

Answer Link
clickykeyboardasmr
clickykeyboardasmr clickykeyboardasmr
  • 01-12-2021

496/8=62

Hope this helps!

Answer Link

Otras preguntas

Determine how many moles of Ba(OH)2 are required to completely neutralize 0.425 mole of HC2H3O2.
Assume there are 100 million passenger cars in the. United States and that the average fuel consumption is. 20 mi/gal of gasoline. If the average distance trave
A company that packages cold cuts needs to transport the packaged meat to the supermarket. It will cost $1,200 to rent a truck, and it will cost an additional
A company rents cars for a fee of 30$plus 10$ per hour of use. Write an algebraic expression for the total cost for renting the car for h hours
A pentagon with one interior angle that measures 210 is a __________ polygon. A. concave B. convex C. regular D. none of the above
"Seven dash eighthsSeven-eighths of my cats plus eighteight​." how many cats
If you wanted to increase your muscular endurance, it would be important to participate in activities that
What is the chemical formula for aluminum fluoride?
what are the roots of -12x^2 11x − 3 = 0?
round 5.04 to to nearest tenth