josephmarvens2787 josephmarvens2787
  • 04-03-2022
  • Biology
contestada

When was the keystone pipeline scheduled to be completed.

Respuesta :

Аноним Аноним
  • 04-03-2022

Answer:

2021 - 2022, but the truth is it never got completed.

Answer Link

Otras preguntas

A regular polygon is drawn in a circle so that each vertex is on the circle and is connected to the center by a radius. Each of the central angles has a measure
People cannot use most of the freshwater on Earth because it is in the form of ______?
A lawn mower manufacturer incurs a total of $34,816 in overhead costs and $388 per lawn mower in production costs. How many lawn mowers were manufactured if the
The smallest known bacteria are from the genus Mycoplasma and can measure as small as 300 nanometers in diameter. Given that 1 meter = 1 x 109 nanometers, what
48 inches long and 24 inches wide. What is the area of the poster in square feet?
What did both groups of Indians do for food
how did the scientific revolution change the way Europeans viewed the universe and the place of human beings in it
what is the answer to -12x+13x
What does Jonathan get in exchange for the reble money he had saved?
How many twentieths are in five halves