ridume2020 ridume2020
  • 02-01-2024
  • Mathematics
contestada

Montu finishes a piece of work in 24 days. How much work will he complete in 8 days?​

Respuesta :

ahmedmaham984
ahmedmaham984 ahmedmaham984
  • 02-01-2024

Answer:

Therefore, he will complete 1/3 of the work in 8 days as 24 ÷ 8 = 3.

Answer Link

Otras preguntas

what geographic features marked the western boundary of the united sates, at the end of the revolutionary war?
Helen of troy is blamed to have caused what main event? a. the trojan war b. world war ii c. korean war d. persian war
A man wants to build a windmill to generate electricity. what type of energy is the man trying to take from the wind?
Can you solve 64x³=27
What force is not taken into account in the formation of a covalent bond?
Is this a good thesis statement Single parents face many challenges as they try to juggle all of their responsibilities
In which of the following does the last stage of digestion take place and is where water is absorbed into the bloodstream? a.small intestine c.rectum b.large i
1). What is NOT characteristics of blank verse? A). Rhyme B). set meter C). A set foot 2). You can trust a dissembler? A). True B). False 3). Where doe
Why would there be cause for concern if a young pregnant mother is rh-, her husband is rh , and this is their second child?
Read the sentence. A new airplane—that was my conclusion about the strange lights in the sky. What kind of pronoun is that in the sentence?